Home

Headlines Weather Search

News

Sports

Business

World

Radio

Radio Fiji One Mirchi FM Gold FM Bula FM 2Day FM Radio Fiji Two

TV

FBC TV FBC Sports FBC 2

News

Repairs to wastewater leakage at Denarau Bridge complete

March 7, 2019 8:06 am
[Source: WAF]

The Water Authority has completed repairs to the leaking wastewater rising main located before the bridge to Denarau Island in Nadi.

The Authority says work was completed by yesterday morning.

During the repair period, trucks were continuously bailing from the Regent Wastewater Pumping Station, to minimize the flow into the pipeline to allow repairs as well as to prevent leakages.

Article continues after advertisement

Keep Connected With The Latest News, Weather, And Sports on Fiji's Best Radio stations.

Live Tune In
  • 95.4 FM
  • Suva, Nadi, Lautoka, Labasa
  • 95.2 FM
  • Sigatoka, Ba
  • 95.6 FM
  • Tavua
  • 95.8 FM
  • Rakiraki
Live Tune In
  • 102.6 FM
  • Suva, Nadi, Lautoka, Labasa
  • 102.4 FM
  • Sigatoka, Ba
  • 102.8 FM
  • Tavua
  • 103.0 FM
  • Rakiraki
Live Tune In
  • 97.8 FM
  • Suva, Nadi, Lautoka, Labasa
  • 97.6 FM
  • Sigatoka, Ba
  • 98.0 FM
  • Tavua
  • 98.2 FM
  • Rakiraki
Live Tune In
  • 93.0 FM
  • Suva, Nadi, Lautoka, Labasa
  • 92.8 FM
  • Sigatoka, Ba
  • 93.2 FM
  • Tavua
  • 93.4 FM
  • Rakiraki
Live Tune In
  • 100.2 FM
  • Suva, Nadi, Lautoka, Labasa
  • 100.0 FM
  • Sigatoka, Ba
  • 100.4 FM
  • Tavua
  • 100.6 FM
  • Rakiraki
Live Tune In
  • 105.0 FM
  • Suva, Nadi, Lautoka, Labasa
  • 104.8 FM
  • Sigatoka, Ba
  • 105.2 FM
  • Tavua
  • 105.4 FM
  • Rakiraki