Home

Headlines Weather Search

News

Sports

Business

World

Radio

Radio Fiji One Mirchi FM Gold FM Bula FM 2Day FM Radio Fiji Two

TV

FBC TV FBC Sports FBC 2

News

Repair work begins at Vaturu Dam

April 19, 2019 12:45 pm

Major repair work to restore a leakage along the Vaturu-Nagado high pressure water pipeline at Batiri is now underway.

Water Authority Manager Customer Services Sekove Uluinayau says the leakage is suspected to have started from the welding joints and has deteriorated over the last few weeks.

Uluinayau says the leakage has resulted in WAF losing approximately a million liters of water per day.

Article continues after advertisement

He adds residents are advised that WAF will carting water to affected areas where water tanks are located.

Trucks are on standby to provide backups to these tanks and re-fill these tanks once empty. Also for some critical areas, we are supporting them by involving water carting trucks.

Water supply is currently disrupted in parts of Lautoka and is expected to normalize by 6am Tuesday morning.

Keep Connected With The Latest News, Weather, And Sports on Fiji's Best Radio stations.

Live Tune In
  • 95.4 FM
  • Suva, Nadi, Lautoka, Labasa
  • 95.2 FM
  • Sigatoka, Ba
  • 95.6 FM
  • Tavua
  • 95.8 FM
  • Rakiraki
Live Tune In
  • 102.6 FM
  • Suva, Nadi, Lautoka, Labasa
  • 102.4 FM
  • Sigatoka, Ba
  • 102.8 FM
  • Tavua
  • 103.0 FM
  • Rakiraki
Live Tune In
  • 97.8 FM
  • Suva, Nadi, Lautoka, Labasa
  • 97.6 FM
  • Sigatoka, Ba
  • 98.0 FM
  • Tavua
  • 98.2 FM
  • Rakiraki
Live Tune In
  • 93.0 FM
  • Suva, Nadi, Lautoka, Labasa
  • 92.8 FM
  • Sigatoka, Ba
  • 93.2 FM
  • Tavua
  • 93.4 FM
  • Rakiraki
Live Tune In
  • 100.2 FM
  • Suva, Nadi, Lautoka, Labasa
  • 100.0 FM
  • Sigatoka, Ba
  • 100.4 FM
  • Tavua
  • 100.6 FM
  • Rakiraki
Live Tune In
  • 105.0 FM
  • Suva, Nadi, Lautoka, Labasa
  • 104.8 FM
  • Sigatoka, Ba
  • 105.2 FM
  • Tavua
  • 105.4 FM
  • Rakiraki