The Nadi River Bridge on the old back road will be temporarily closed for two nights, starting this evening.
The temporary closure will allow contractor -Higgins to carry out concrete repair work to the deck of the bridge.
The closure is for a period of eight and a half hours with work beginning at 8:30pm.
Article continues after advertisement
The bridge will re-open for normal use at 5:00am.
Motorists are being advised to use alternative routes during the period of closure.
Advertisement